It is a two-component, fully elastic waterproofing mortar based on cement and liquid polymer.
Surface Preparation
The application surface should be solid, load-bearing and clean. Oil, press, rust, paint, paraffin and cure residues that will weaken the adherence should be cleaned. Sections with water leakage should be filled. Corners and edges should be chamfered. The surface should be saturated with water before application. Care should be taken to ensure that there is no free water on the ground before starting the application.



