It is a cement-based, polymer-reinforced, high-fluidity, non-shrinking, high-strength, self-leveling grout mortar.
Surface Preparation
Machine and Foundation Preparation: Before placing the machine, loose and damaged areas in the concrete should be cleaned, and the surfaces where grout mortar will be applied should be roughened. Any foreign material such as oil, dust, etc. that may affect the performance of the grout mortar on the application surface should be cleaned. Air discharge holes should definitely be opened in the base plate. The machine should be placed, its scale and position should be adjusted. This position should not be changed at all. If the adjustment wedges are to be removed, they should be oiled a small amount so that the grout mortar does not stick. After the placement of the machine and the adjustments, the foundation concrete should be saturated with water at least 6 hours before the grout mortar is poured. Mold Preparation: Molds should be made of solid material that will not leak or absorb free water, and should be mounted in a way that will withstand the resistance it will encounter. There should be a 5 cm casting gap between the base plate edge where the grout mortar will be poured and the mold. In order to ensure the spread of the grout mortar, the mold height should also be considered on the casting side according to the situation.